Xcel Energy 2008 Annual Report Download - page 14

Download and view the complete annual report

Please find page 14 of the 2008 Xcel Energy annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 172

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172

DSMCA Demand-side management cost adjustment. A clause permitting PSCo to recover demand-side
management costs over five years while non-labor incremental expenses and carrying costs
associated with deferred DSM costs are recovered on an annual basis. Costs for the low-income
energy assistance program are recovered through the DSMCA.
ECA Retail electric commodity adjustment. The ECA, effective Jan. 1, 2007, is an incentive adjustment
mechanism that compares actual fuel and purchased energy expense in a calendar year to a
benchmark formula. It encourages cost reductions through purchases of economical short-term
energy. The ECA also provides for an $11.25 million cap on any cost sharing over or under an
allowed ECA formula rate. The ECA mechanism will be revised quarterly and interest will accrue
monthly on the average deferred balance. The ECA will expire at the earlier of rates taking effect
after Comanche 3 is placed in service or Dec. 31, 2010.
FCA Fuel clause adjustment. A clause included in electric rate schedules that provides for monthly rate
adjustments to reflect the actual cost of electric fuel and purchased energy compared to a prior
forecast. The difference between the electric costs collected through the FCA rates and the actual
costs incurred in a month are collected or refunded in a subsequent period.
GCA Gas cost adjustment. Allows PSCo to recover its actual costs of purchased natural gas and natural
gas transportation. The GCA is revised monthly to coincide with changes in purchased gas costs.
OATT Open Access Transmission Tariff
PCCA Purchased capacity cost adjustment. Allows PSCo to recover from retail customers for all
purchased capacity payments to power suppliers, effective Jan. 1, 2007. Capacity charges are not
included in PSCos electric rates or other recovery mechanisms.
PGA Purchased gas adjustment. A clause included in NSP-Minnesotas and NSP-Wisconsins retail
natural gas rate schedules that provides for prospective monthly rate adjustments to reflect the
forecasted cost of purchased natural gas and natural gas transportation. The annual difference
between the natural gas costs collected through PGA rates and the actual natural gas costs is
collected or refunded over the subsequent period.
QSP Quality of service plan. Provides for bill credits to retail customers if the utility does not achieve
certain operational performance targets and/or specific capital investments for reliability. The
current QSP for the PSCo electric utility provides for bill credits to customers based on
operational performance standards through Dec. 31, 2010. The QSP for the PSCo natural gas
utility also expires December 2010.
SCA Steam cost adjustment. Allows PSCo to recover the difference between its actual cost of fuel and
the amount of these costs recovered under its base steam service rates. The SCA is revised
annually to coincide with changes in fuel costs.
TCR Transmission cost recovery adjustment. Allows NSP-Minnesota to recover the cost of transmission
facilities not included in the determination of NSP-Minnesotas electric rates in retail electric rates
in Minnesota. The TCR was approved by the MPUC in 2006 to be effective in 2007, and will
be revised annually as new transmission investments and costs are incurred.
Other Terms and Abbreviations
AFDC Allowance for funds used during construction. Defined in regulatory accounts as a non-cash
accounting convention that represents the estimated composite interest costs of debt and a return
on equity funds used to finance construction. The allowance is capitalized in property accounts
and included in income.
ALJ Administrative law judge. A judge presiding over regulatory proceedings.
ARO Asset Retirement Obligation. Obligations associated with the retirement of tangible long-lived
assets and the associated asset retirement costs.
BART Best Available Retrofit Technology
CO2Carbon dioxide
C20 Derivatives Implementation Group of FASB Implementation Issue No. C20. Clarified the terms
clearly and closely related to normal purchases and sales contracts, as included in SFAS No. 133.
CAIR Clean Air Interstate Rule
CAMR Clean Air Mercury Rule
CapX 2020 An alliance of electric cooperatives, municipals and investor-owned utilities in the upper Midwest
involved in a joint transmission line planning and construction effort.
COLI Corporate-owned life insurance
decommissioning The process of closing down a nuclear facility and reducing the residual radioactivity to a level
that permits the release of the property and termination of license. Nuclear power plants are
required by the NRC to set aside funds for their decommissioning costs during operation.
derivative instrument A financial instrument or other contract with all three of the following characteristics:
An underlying and a notional amount or payment provision or both,
Requires no initial investment or an initial net investment that is smaller than would be
required for other types of contracts that would be expected to have a similar response
to changes in market factors, and
Terms require or permit a net settlement, can be readily settled net by means outside the
contract or provides for delivery of an asset that puts the recipient in a position not
substantially different from net settlement.
distribution The system of lines, transformers, switches and mains that connect electric and natural gas
transmission systems to customers.
EPS Earnings per share of common stock outstanding
FASB Financial Accounting Standards Board
4