Chevron 2013 Annual Report Download - page 2

Download and view the complete annual report

Please find page 2 of the 2013 Chevron annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 88

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88

8 Glossary of Energy and Financial Terms
9 Financial Review
6 6 Five-Year Financial Summary
6 7 Five-Year Operating Summary
Contents
2 Letter to Stockholders
4 Chevron Financial Highlights
5 Chevron Operating Highlights
6 Chevron at a Glance
8 1 Chevron History
82 Board of Directors
83 Corporate Officers
8 4 Stockholder and Investor Information
On the cover: In mid-November 2013 the floating production unit for the Jack/St. Malo development began its journey from the fabrication
yard in Ingleside, Texas, to its mooring location in the Walker Ridge area of the deepwater U.S. Gulf of Mexico. Installation was completed,
and first oil is expected in late 2014.
This page: The Angola liquefied natural gas (LNG) plant, located in Soyo, made its first shipment in the second quarter of 2013. It is the
world’s first LNG plant supplied by natural gas that is a byproduct of crude oil production. Angola LNG is one of the largest energy projects
on the African continent.