Frontier Airlines 2006 Annual Report Download - page 138

Download and view the complete annual report

Please find page 138 of the 2006 Frontier Airlines annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 313

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293
  • 294
  • 295
  • 296
  • 297
  • 298
  • 299
  • 300
  • 301
  • 302
  • 303
  • 304
  • 305
  • 306
  • 307
  • 308
  • 309
  • 310
  • 311
  • 312
  • 313

ATTACHMENT “A-2” - EMBRAER 175 AIRCRAFT CONFIGURATION
Delta Configuration
***
3. FINISHING
The Aircraft will be delivered to Buyers as follows:
3.1 EXTERIOR FINISHING:
The fuselage of the Aircraft shall be painted according to Buyers color and paint scheme which shall be supplied to Embraer
by Buyer on or before six (6) months prior to the relevant Aircraft ContractualDeliveryDate.
The wings and the horizontal stabilizer of all Aircraft shall be supplied in the standard colors, i.e., gray BAC707.
3.2 INTERIOR FINISHING:
Buyer shall inform Embraer on or before *** months prior to the relevant Aircraft Contractual Delivery Date of its choice of
materials and colors of all and any item of interior finishing such as seat covers, carpet, floor lining on galley areas, side
walls and overhead lining, galley lining and curtain. The above-mentioned schedule for definition of interior finishing shall
only be applicable if Buyer selects its materials from the choices offered by and available at Embraer. In case Buyer opts to
use different materials and or patterns, such schedule shall be mutually agreed between the Parties at the time of signature of
the Purchase Agreement.
3.3 BUYER FURNISHED AND BUYER INSTALLED EQUIPMENT (BFE and BIE):
Buyer may choose to have carpets, tapestries, seat covers and curtain fabrics supplied to Embraer for installation in the
Aircraft as BFE. Materials shall conform to the required standards and comply with all applicable regulations and
airworthiness requirements. Delays in the delivery of BFE equipment or quality restrictions that prevent the installation
thereof in the time frame required by the Aircraft manufacturing process shall entitle Embraer to either delay the delivery of
the Aircraft or present the Aircraft to Buyer without such BFE, in which case Buyer *** of the Aircraft. All BFE equipment
shall be delivered to Embraer in DDP - Embraer facilities in Săo José dos Campos, SP, Brazil (Incoterms 2000) conditions.
The Aircraft galleys have provisions for the following BIE items that, unless timely agreed by the Parties, are not supplied or
installed by Embraer: Trolleys, ovens, coffee makers, hot jugs and standard units.
4. REGISTRATION MARKS AND TRANSPONDER CODE
The Aircraft shall be delivered to Buyer with the registration marks painted on them. The registration marks and the
transponder code shall be supplied to Embraer by Buyer no later than ninety (90) Days before each relevant Aircraft
Contractual Delivery Date.
IT IS HEREBY AGREED AND UNDERSTOOD BY THE PARTIES THAT IF THERE IS ANY CONFLICT BETWEEN THE
TERMS OF THIS ATTACHMENT “A-2” AND THE TERMS OF THE TECHNICAL DESCRIPTION ABOVE REFERRED, THE
TERMS OF THIS ATTACHMENT “A-2” SHALL PREVAIL.
Source: REPUBLIC AIRWAYS HOLDINGS INC, 10-K, March 15, 2007 Powered by Morningstar® Document Research