Royal Caribbean Cruise Lines 2001 Annual Report Download - page 26

Download and view the complete annual report

Please find page 26 of the 2001 Royal Caribbean Cruise Lines annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 56

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56

24 Royal Caribbean Cruises Ltd.
GRAY WATER BLACK WATER BILGE WATER
Cabin Sinks &
Showers
Laundry
Galley
A/C Condensate
Salon
Holding Tank
Approved
Shoreside
Treatment
Facility
(or) (or) (or)
Discharge
to Sea
Beyond
12 nm
Toilets
Medical Facility
Sinks
Approved
Shoreside
Treatment
Facility
Discharge
to Sea
Beyond
12 nm
Black Water
Holding
Tank
Black Water
Treatment
All liquids collected
in open spaces in the
bottom of the ship
Holding Tank
Treatment Unit
Monitor >5ppm
Documentation
Monitor >5ppm
Clean Holding Tank
Approved
Shoreside
Treatment
Facility
Discharge
to Sea
Beyond
12 nm
WASTE STREAM OPERATIONAL CONTROLS
Discharge if beyond 12 nm and < 5 parts
per million (ppm) oil.
< 15 ppm, discharged while underway.
Yes
CORPORATE POLICY Discharge beyond 12 nm with ship’s
speed > 6 knots or land for treatment
by shore facility.
Local
Yes
Physical removal of plastics & other debris;
land remainder for treatment by shore facility
or discharge beyond 12 nm with ship’s
speed > 6 knots.
Treated discharge beyond 4 nm.
Yes
REGULATORY STANDARDS
ABOVE AND BEYOND
COMPLIANCE