Dish Network 2005 Annual Report Download - page 20

Download and view the complete annual report

Please find page 20 of the 2005 Dish Network annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 132

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132

10
AMC-15. AMC-15 commenced commercial operation during January 2005 and currently operates at the 105 degree
orbital location. This SES Americom FSS satellite is equipped with 24 Ku FSS transponders that operate at
approximately 120 watts per channel and a Ka FSS payload consisting of 12 spot beams. The ten-year satellite
service agreement for this satellite is renewable by us on a year to year basis following the initial term, and provides
us with certain rights to replacement satellites.
AMC-16. AMC-16 commenced commercial operation during February 2005 and currently operates at the 118.7
degree orbital location. This SES Americom FSS satellite is nearly identical to AMC-15 and is equipped with 24
Ku FSS transponders that operate at approximately 120 watts per channel and a Ka FSS payload consisting of 12
spot beams. The ten-year satellite service agreement for this satellite is renewable by us on a year to year basis
following the initial term, and provides us with certain rights to replacement satellites.
Satellites under Construction
We have entered into contracts to construct a number of additional satellites, including the following satellites which
are contractually scheduled to be completed within the next three years.
EchoStar XI, a Space Systems/Loral, Inc. (“SSL”) DBS satellite, is expected to be completed in 2007.
However, the launch could be delayed until the second half of 2008 as a result of problems currently being
experienced by the launch provider, Sea Launch. EchoStar XI is expected to provide service to CONUS
from the 110 degree orbital location. This satellite will enable better bandwidth utilization, provide back-
up protection for our existing offerings, and could allow DISH Network to offer other value-added services.
Four additional SSL Ka and/or Ku expanded band satellites are contractually scheduled to be completed
during 2008 and 2009. They would enable better bandwidth utilization and could allow DISH Network to
offer other value-added services.
CMBStar, an S-band satellite, is scheduled to be completed during the second quarter of 2008. Provided
required regulatory approvals are obtained and contractual conditions are satisfied, the transponder capacity
of that satellite will be leased to an affiliate of a Chinese regulatory entity to support the development of
satellite-delivered mobile video services in China.
During January 2007, we entered into a contract for the construction of EchoStar XIV, an SSL DBS
satellite, which is expected to be completed during 2009. This satellite has been designed with a
combination of CONUS and spot beam capacity and could be used at multiple orbital locations. EchoStar
XIV could allow DISH Network to offer other value-added services.
We have also entered into agreements to lease capacity on the following satellites currently under construction.
An SES Americom DBS satellite (“AMC-14”) which is currently expected to launch during late 2007, and
commence commercial operation in early 2008 at an orbital location to be determined at a future date. The
satellite is being equipped with transmit antennas optimized for multiple orbital locations, providing greater
backup flexibility in the event certain other in orbit satellites fail.
A Telesat FSS satellite (“Anik F3”) which is currently scheduled to be launched during second quarter of
2007 and commence commercial operation at the 118.7 degree orbital location. This satellite could allow
DISH Network to offer other value-added services.
A Canadian DBS satellite (“Ciel 2”) which is currently scheduled to be launched during 2009 and
commence commercial operation at the 129 degree orbital location, has both spot and CONUS capabilities.
This satellite could be used to provide HD programming to CONUS and as additional backup capacity.
We are significantly increasing our satellite capacity as a result of the agreements discussed above and other satellite
service agreements currently under negotiation. While we are currently evaluating various opportunities to make
profitable use of this capacity (including, but not limited to, increasing our international programming and other