eTrade 2000 Annual Report Download - page 168

Download and view the complete annual report

Please find page 168 of the 2000 eTrade annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 263

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263

Name: Robert Clegg
Its: Vice President
By: /s/ Len Purkis
Name: Len Purkis
Its: Chief Financial Officer
EXHIBIT 1
PRELIMINARY PLANS
The term “Preliminary Plans” shall refer to the plans listed below prepared by Studios Architecture.
Sheet No. Title Date
A0.00 Cover Sheet 10/30/98
A1.21 Building 4200-First Floor Demo Plan 10/30/98
A1.22 Building 4200-Second Floor Demo Plan 10/30/98
A2.21 Building 4200-First Floor Plan 10/30/98
A2.22 Building 4200-Second Floor Plan 10/30/98
A6.21 Building 4200-First Floor R.C.P. 10/30/98
A6.22 Building 4200-Second Floor R.C.P. 10/30/98
EXHIBIT 2
RESTORATION CONDITION SPECIFICATIONS
All citations to “Sheets” refer to the Preliminary Plans.
Item Modification Work Required
Columns The walls that are adjacent to the columns along grid line 3, 4, and 6 shall be moved so that the columns are
within such gypsum board walls.
Ceiling systems The reflected ceiling plan of the Preliminary Plans indicates that portions of the ceiling existing as of the date
of the Lease are to be removed and, following completion of Tenant’ s work in the Premises, there shall be no
suspended ceiling system in these areas, but instead the underside of the structure of the second floor, or roof,
as the case may be, shall be exposed. In such areas, Tenant shall install a suspended ceiling system to match the
adjacent ceiling system, subject to Landlord s review and approval of such system to be specified in the
Modification Work Plans, and which shall be installed with a uniform and level grid, as if all of such areas were
finished with the ceiling system at the time of Tenant’ s construction activities. The finishes, including but not
limited to mechanical systems, lighting and other electrical distribution shall conform to other general office
space within the Building as reasonably determined by Landlord.
Building
infrastructure
The Herculite doors and side light panels in the lobby, six (6) doors with frames in good condition, six (6)
doors with frames including integral side lights in good condition, and any VAV boxes that are demolished by
Tenant, shall be palletized and delivered to Landlord’ s designated storage area.
Gypsum board ceiling
system
The reflected ceiling plan of the Preliminary Plans indicates that portions of the ceiling existing as of the date
of the Lease are to be removed and, following completion of Tenant’ s work in the Premises, in certain areas,
including the ceiling adjacent to the second floor restroom, gypsum board ceiling will be installed. In such
areas, Tenant shall remove the gypsum board ceiling and install a suspended ceiling system to match the
adjacent ceiling system specified in the Modification Work Plans, and which ceiling system shall be installed
with a uniform and level grid, as if all of such areas were finished with the ceiling system at the time of
Tenant s construction activities. The finishes, including but not limited to mechanical systems, lighting and
other electrical distribution shall conform to other general office space within the Building as reasonably
determined by Landlord.
2002. EDGAR Online, Inc.