AMD 2003 Annual Report Download - page 247

Download and view the complete annual report

Please find page 247 of the 2003 AMD annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 293

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293

signals or impulses and energy, including, but not limited to, utilities and all and any means for disposal of such or like substances. Contractor is aware of
all and any conditions which could have an impact, including, but not limited to, detrimental impact by vibrations, on the proper operation of Fab 30
and/or on the proper production, including, but not limited to, the production of semiconductor processors, within Fab 30, including, but not limited to,
those which could, will or could arise or which will or could be caused by the execution of the Works (or by the execution of changes or Additional
Works) to be carried out by Contractor or by subcontractor. Contractor has carried out all surveys necessary or expedient to examine and review all and
any Site Conditions, including, but not limited to surveys with respect to subsurface conditions, the vibration risk, the impact of radar
(Radarverträglichkeit) and all risks which could lead to an interruption or limitation of the production or could have a detrimental impact on a proper
operation of Fab 30 or Fab X or the unlimited, unrestricted and proper production, including, but not limited to, the production of semiconductor
processors, within the Fab 30 or Fab X.
Contractor warrants (i) that the work, the Works, any changes and Additional Works and the design shall satisfy Company´s requirements for clean
room air quality, process equipment (unless unknown by Contractor), vibration, particularity, air, water and other quality requirements of Company; (ii)
that the execution of the Works and of any changes and Additional Works will not lead to any vibrations which affect, influence, disturb or have any
other detrimental impact on the unlimited, unrestricted, and proper operation of Fab 30 or Fab X or on the unlimited, unrestricted and proper production,
including, but not limited to, the production of semiconductor processors, within Fab 30 or Fab X and that the Works any changes and Additional
Works or the execution of the Works any changes and Additional Works will not affect, influence, disturb or have any other detrimental impact on the
unlimited, unrestricted and proper operation of Fab 30 or Fab X or on the unlimited, unrestricted and proper production, including, but not limited to, the
production of semiconductor processors, within Fab 30 or Fab X; (iii) that Contractor has only employed and selected and will only use such means and
methods which cannot affect, influence, harm or have any other detrimental impact on the unlimited, unrestricted and proper operation of Fab 30 or Fab X
or on the unlimited, unrestricted and proper production, including, but not limited to the production of semiconductor processors, within Fab 30 or Fab X;
(iv) that Contractor has carefully examined and reviewed any and all means and methods to be employed for the execution of the Works any changes and
Additional Works to be executed under this Agreement; (v) that Contractor
34
Source: ADVANCED MICRO DEVIC, 10-K, March 09, 2004