TeleNav 2011 Annual Report Download - page 202

Download and view the complete annual report

Please find page 202 of the 2011 TeleNav annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 280

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280

Passage Set
Other
Execution
Division 9 — Finishes
General Notes
09500 Ceilings
Suspended Ceiling System
General
13
Cylinder/Key Way
-
Schlage E 6 pin
MODEL D
-
Series, ND10S (Passage Set)
DESCRIPTION: Schlage Heavy Duty Lever Handle. Both levers always unlocked. Finish and lever design per notes
above.
Door hold opens
Electric door holders Edwards Cat # 1504
-
N5
Door closures
LCN 4041
-
Super Smoothee or Norton 149A finish 26
Floor mount door stops
To match existing.
Coat Hooks
Confirm with Building Management
Locksmith vendor will be specified by Equity Office for all cylinder installation and keying. Keying of all interior and exterior
doors shall be compatible with building master
Construction: Provide construction keyway during construction.
Only water based, low-VOC, adhesive materials may be applied in the building. No out-gassing type of water proofing or adhesive
shall be used without Building management
s prior approval and work shall occur after hours only.
Contractor to perform moisture testing as required ensuring proper substrate/installation/performance.
Prior to installation of flooring, installer shall inspect the surfaces to which flooring products will be applied. All cracks,
depressions and minor bumps must be filled. All voids in the substrate shall be filled with commercially manufactured filler
material.
Unless otherwise noted in specific project instructions, where cross members are damaged, bent or have screw holes, they shall be
replaced. Where mains are damaged, bent or have more than 3 screw holes, they shall be replaced. In mains with (3) screw holes or
less, holes shall be caulked and smoothed flush with grid surfaces.
Not all ceilings are properly braced with compression struts, proper wall angle and seismic control joints. After inspection of
premises ceiling shall be modified as required to meet current codes.
Contractor to replace damaged tile where occurs. Provide new tile as required to complete the ceiling; do not mix existing and new
tile in the same room (relocate existing tiles where required). Contractors shall provide exact quantity of tile to be replaced in bids.
It is assumed that only significantly damaged tile will be replaced and that existing tiles with minor imperfections will remain
unless otherwise noted.