TeleNav 2011 Annual Report Download - page 200

Download and view the complete annual report

Please find page 200 of the 2011 TeleNav annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 280

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280

Division 8 — Doors and Windows
08050 Basic Door and Window Materials and Methods
General
08100 Doors and Frames
Tenant Entry Door
Interior Doors:
11
All modifications to building roofing, flashing, waterproofing system assemblies are to be completed by sub-contractors specified
by Equity Office. Contractor shall obtain name and contact information and solicit a proposal from the approved Roofing sub-
contractor prior to submitting any pricing for the project
All sheet metal roof flashing shall confirm to SMACNA standards
The existing building may have in place a number of different doors (wood species, cut and finish), door frames and hardware. Re-
use of non-building std. doors, frames and hardware will be considered on a case by case basis by the landlord. New & remodel
construction should comply with below listed standards unless otherwise permitted by landlord
Contractor shall repair/re
-
finish existing doors where occurs. Touch
-
up existing frames as required.
All re-keying of locks must be coordinated with Building Management, or a locksmith designated by Building Management.
Contractor shall ensure that all new locksets include the correct, building standard key way
Interior tenant doors are to be equipped with hinges, latch set and floor stop.
Doors, frames, glazing being demolished shall be stored or disposed of at the direction of Building Management.
Doors shall meet all requirements for accessibility including hardware and required door clearances.
Should panic bar exit devices be required for a tenant’s specific occupancy type, then that tenant shall be responsible for costs
associated with upgrading other doors in the building along the required exit paths.
Use fire rated doors in locations as required by Code. Doors shall have the testing laboratory label with the appropriate rating
indicated. (U.L.Rated)
Tenant to provide all required keys and cardkeys for building for installation into the knox box.
1.
Single Rated Entry Door:
All corridor doors single 3
-
0
x full height (ceiling height unless otherwise specified) to be building standard finish with
building standard lever hardware. Provide submittals for approval.
2.
Double Entry Doors
Same as Single Entry Door above, except
pair
3
-
0
x full height (ceiling height unless otherwise specified) x 1
-
3/4
doors.
Frame:
A.
20
-
min. fire rated clear anodized aluminum, flush frame to match building standard.
B.
Use fire rated frames in locations as required by Code. Frames shall have the testing laboratory label with the
appropriate rating indicated