TeleNav 2011 Annual Report Download - page 193

Download and view the complete annual report

Please find page 193 of the 2011 TeleNav annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 280

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280

Construction Specification Institute Index
Division 1 — General Requirements
Division 2 — Site Construction
Division 3 — Concrete
Division 4 — Masonry
Division 5 — Metals
Division 6 — Wood and Plastics
Division 7 — Thermal and Moisture Protection
Division 8 — Doors and Windows
Division 9 — Finishes
Division 10 — Specialties
Division 11 — Equipment
Division 12 — Furnishing
Division 13 — Special Construction
Division 14 — Conveying Systems
Division 15 — Mechanical
Division 16 — Electrical
Division 1 — General Requirements
01100 Summary
4
In the event that Drawings and Specifications are provided along with these Building Standards for project bidding, in the event of
conflict between the Drawings and Specification and the Building Standard, the Drawings and Specification will take precedent
over the Building Standards
Relative to the use of these Building Standards and existing conditions encountered in any space, when improvement Plans and
Specifications are not provided and Building Standards indicate finishes and material specifications (for example doors/frames/
hardware, lighting fixtures etc) that do not match existing conditions within the space to be improved, the Contractors are required
to list the differences and request direction from Equity Office prior to proceeding.
When the Contractor provides pricing for the work, the Building Standards shall apply for all new work unless otherwise directed
by Equity Office.
When the Architect provides Plans and Specifications, the Building Standards shall apply for all new work unless otherwise
directed by Equity Office.
For Mechanical, Electrical, Plumbing, Fire Alarm and Fire Protection improvements, these Building Standards will apply unless
directed otherwise by Equity Office
It is the responsibility of the general contractor and the appropriate subcontractors to familiarize themselves with existing
conditions, and to ascertain the complete scope of the mechanical, electrical, fire life safety, structural and plumbing work -
including specific requirements, capacities and specifications required to execute this project in accordance with design intent.
Certificate of Insurance: Any company or person who may be furnishing labor or services for the Project shall have a certificate of
insurance on file with the Equity Office building office, evidencing insurance coverage’s required by the Lease or otherwise
satisfactory to the Landlord, and naming the landlord, Equity Office Management, L.L.C. and any other parties required by the
landlord as additional insured before work starts.
Contractors to field verify all dimensions and requirements. Report all discrepancies or omissions to Equity Office.