CompUSA 2014 Annual Report Download - page 111

Download and view the complete annual report

Please find page 111 of the 2014 CompUSA annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 200

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200

- 31 -
Electric Service:
Nevada Energy & Power is provider with electric main service on south side of Building.
Exterior Lighting:
Wall packs, pole lights and building soffit lights included and to provide a minimum of 2 FC @
office entry and a minimum of 1 FC @ all paved areas and building exits. These lights to be LED
technology. Electrical provisions shall be included for building mounted signage (2) and
monument sign (provided by builder/landlord) with exterior lighting. Building mounted signage
by tenant with electric hookup by builder / developer.
Paving:
Full concrete aprons, curbs, gutters as well as truck and auto areas is included.
Signage:
Tenant requests that Landlord, at its cost and expense, provide the following signage:
Building face sign ($15,000 allowance).
Dock Door decals (to be included within the $15,000 allowance).
Note: all signage is subject to the terms of the Prologis Lease Agreement and all applicable city,
county and state regulations and codes.
Notes:
Tenant shall have the right to observe, review and audit all aspects of the construction process but
shall not materially impact or delay the construction process. All final design and construction
decisions shall be mutually agreed upon between Landlord and Tenant. Tenant shall be provided
access for Early Access for racking and equipment setup, installation of its material handling
equipment and IT cabling April 1, 2015.
(Note - The only allowance provided is for $15,000 signage allowance which tenant will control
for its signage needs)