CompUSA 2014 Annual Report Download - page 110

Download and view the complete annual report

Please find page 110 of the 2014 CompUSA annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 200

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200

WH /OFFICE FINISHES
- 30 -
Warehouse Office: 4,800 SF @ 9’0”
ceiling height including lunchroom and restroom to support forty (40) employees
at a time. Balance of space to be general offices and meeting rooms as
Shipping Office:
637 SF including two (2) small restrooms (middle of shipping docks).
Ceilings:
Ceilings shall be 9’0” A.F.F. All acoustical ceilings in 5400 SF WH (and remote shipping office)
shall use standard commercial grade grid and ceiling tiles. All ceilings shall be insulated with a
minimum of R-19 fiber glass batting for sound and thermal protection. ALL facility bathroom
ceilings shall be painted drywall.
Floor Coverings:
Gym plus 5 offices to have carpet tile (@$30/ S.Y.) and vinyl base, all other warehouse rooms
shall be VCT with 4” vinyl base. Restrooms to have ceramic tile floors.
Wall Finishes:
Remote receiving (647 S.F.) WH office areas to be painted concrete block perimeter walls to
10’0” nominal height) and drywall (interior walls) with two (2) coats of latex paint with semi-
gloss or egg finish.
Shipping office (4800 S.F.) shall have a full height (slab to roof) drywall (5/8” drywall full height
on warehouse side) demising wall (painted white) and insulated slab to roof for dust and noise
protection. All interior walls to be drywall with two (2) coats of latex paint with semi-gloss or egg
finish.
All private offices, conference walls to extend 6”
above acoustical ceilings. All private offices and
bath rooms to be insulated for sound retention.
Interior Doors and
Windows: All office doors shall be 7’0” high solid core with birch veneer finished with stain and clear satin
polyurethane (factory finish). All frames to be painted metal. Private offices shall have full height
(7’) side lites (nominal 16” wide) built into metal door jambs. All door hardware shall be stainless
steel. Locksets shall be ADA approved stainless steel lever type as manufactured by Sargent
(series 10) or approved equal with IC cores. All private offices shall have keyed lock entry. Master
keying shall be included for all building locks and keying schedule approved by Global. All
interior exit and entrance doors, opening into common areas shall include 5” X 20”
glass windows
mounted in door and include commercial grade door closers. All warehouse egress doors will be
provided with “delay exit” panic hardware with alarm if permitted by code. All exterior office
windows and interior sales office door side lites to include Levelor blinds or approved equal.
Per Scheme 21 and Global plan dated 10/8/14
WASHROOMS Warehouse Offices: All fixtures shall be American Standard or equal. Fixture count for men’s rooms is 3T, 3U, 3S
plus 2 showers (including H.C.). Fixture count for women’s rooms is 5T, 3S plus 2 showers
(including H.C.). Three (3) receiving area bath room shall be located docks as per Global’s plan
dated 10/8/14. (Two (2) Men’s room to have 1T,1U,1S; Women’s room to have 1T,1S). One (1)
electric water cooler shall be provided on common restroom wall for each men/women combo and
one for warehouse office lunchroom (2 total). All interior walls to be drywall floor to ceiling grid.
Washroom plumbing “wet” walls and floors shall be commercial grade ceramic tile with floor
drains. A janitors closet (2 total) shall be provided with slop sink and floor drain. Washrooms
partitions shall be floor mounted. Provide three (3) hose bibs (cold water) at shipping and
receiving docks and battery charging station (outside of warehouse office). Break rooms (2) to
include 12’ “solid surface”
counter (base and wall cabinets), sink and cold water provisions for ice
maker, coffee machine and refrigerator (equipment by Global).
Utilities:
All utilities (electric, gas & water/sewer) shall be delivered to the premises and separately metered
as necessary. Tenant shall be responsible for supplier phone/data connectivity contracts. (See I.T.
Room Electrical subheading) Landlord shall provide required conduits and path to Global’s I.T.
room as shown on plan dated 10/8/14.
Gas Service:
Natural gas supplied to all HVAC units.