AMD 1996 Annual Report Download - page 92

Download and view the complete annual report

Please find page 92 of the 1996 AMD annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 255

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255

1.4.1.2 SUPPORT EQUIPMENT PROCUREMENT. Developing a support
-----------------------------
equipment procurement schedule and plan so as to obtain the support
equipment required for the Project in accordance with the Project Schedule
and the Project Budget.
1.4.1.3 SELECTING SUBCONTRACTORS AND VENDORS. Selecting
------------------------------------
subcontractors and vendors in accordance with this Agreement and
supervising and enforcing the requirements of the Contract on the
performance of subcontracts and purchase orders (exclusive of litigation,
unless first approved in writing by COMPANY or unless the cost of such
litigation is paid for entirely by CONTRACTOR). Ensuring that as a
condition of all subcontracts and purchase orders that subcontractors and
vendors are required to comply with all scheduling procedures, accounting
and auditing procedures, billing procedures, performance reporting
procedures, safety procedures, dispute resolution procedures and procedures
established in the Project Procedures Manual established for the Contract
between CONTRACTOR and COMPANY. CONTRACTOR will coordinate construction
schedules and shop and working drawing development, and insure that same
are communicated to all of CONTRACTOR'S subcontractors.
1.4.2 STANDARDS FOR COMPLETION. It is the intent of the Contract that the
------------------------
Facility shall be complete with all needful appurtenances for satisfactory
operation as identified in the Design Documents, including, without limitation,
comfort-controlled interior environment, proper coordination and control,
safety, reasonably easy access and maintenance, fire defense, life safety, and
the like. Any work or materials not specifically described in or expressly
covered by the Contract but which may be fairly implied as being required
thereby or necessary to make the Facility complete as aforesaid shall be
considered within the purview of the Contract and all such work shall be
performed and all such materials shall be furnished by CONTRACTOR the same as if
specifically described in or expressly covered by the Contract. Such work and
such materials shall be of a quality comparable to the remainder of the Facility
and subject to COMPANY'S approval.
1.5 NATURE OF COMPANY'S APPROVALS. Notwithstanding any review, revision,
-----------------------------
testing, comment or approval by COMPANY of any Design Document, Construction
Work, materials or other aspect of the Project, CONTRACTOR is and shall remain
solely responsible for the plan, design, construction, erection, installation,
equipping, start up, testing, calibration, adjustment and turning over of the
completed Facility to COMPANY in accordance with the terms of the Contract. The
provisions of Sections 4.9, 5.5 and 9.3 shall apply to all such review,
------------ --- ---
revision, testing, comment or approval by COMPANY.
1.6 DEFINITIONS.
-----------
1.6.1 The terms "CONSTRUCTION OUTFIT" and "OUTFIT" where used herein
shall be understood to refer to the equipment, tools, and implements (whether
already owned by CONTRACTOR or rented or purchased by CONTRACTOR expressly for
this job) needed for or in connection with the performance of CONTRACTOR'S work
on the Site, but which do not enter permanently into the construction of the
Facility and will not be needed by COMPANY for or in connection with the
servicing, operation, or protection of the completed Facility.
1.6.2 The word "MATERIALS" where used herein shall mean those goods
or commodities (including equipment) which are intended to enter directly and
permanently into the construction of the Facility, or are required for or in
connection with the servicing, operation, or protection of the completed
Facility as, for example: cement, stone, sand, lumber, millwork, hardware,
brick, concrete, mortar, pipe, tubing, valves, fittings,
6
Source: ADVANCED MICRO DEVIC, 10-K, March 20, 1997