AMD 1996 Annual Report Download - page 106

Download and view the complete annual report

Please find page 106 of the 1996 AMD annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 255

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255

8.15.2 SAFETY PROGRAM. CONTRACTOR shall develop and maintain for the
--------------
duration of the Contract, a safety program that will effectively incorporate and
implement all required safety provisions. CONTRACTOR, as a part of the safety
program, shall maintain at its office or other well-known place at the Site,
safety equipment applicable to the Construction Work as prescribed by the
aforementioned authorities, all articles necessary for giving first aid to the
injured, and shall establish the procedure for the immediate removal to a
hospital or a doctor's care of persons (including employees) who may be injured
on the Site. CONTRACTOR shall appoint an employee who is qualified and
authorized to supervise and enforce compliance with the safety program. Such
employee shall report directly to CONTRACTOR'S senior Project construction
superintendent who shall assure that the safety program is implemented and
observed. Any duty of COMPANY to conduct a construction review of CONTRACTOR'S
performance is not intended to include a review or approval of the adequacy of
CONTRACTOR'S safety supervisor, the safety program, or any safety measures taken
in, on, or near the Site.
8.15.3 REPORTING AND INVESTIGATING ACCIDENTS. If death or serious
-------------------------------------
injuries or serious damages are caused, the accident shall be reported
immediately by telephone or messenger to COMPANY. In addition, CONTRACTOR must
promptly (but in not less than five (5) calendar days after the occurrence of
the accident) report in writing to COMPANY all accidents whatsoever arising out
of, or in connection with, the performance of the Construction Work whether on,
or adjacent to, the Site, giving full details and statements of witnesses.
Contractor shall investigate any such accident and provide to COMPANY a written
report within thirty (30) calendar days after the occurrence of the accident
describing in full detail the corrective actions that Contractor has implemented
to avoid or reduce the likelihood of a recurrence of the accident.
8.15.4 REPORTING CLAIMS. If a claim is made by anyone against
----------------
CONTRACTOR or any subcontractor on account of any accident, CONTRACTOR shall
promptly report the facts in writing to COMPANY, giving full details of the
claim.
8.15.5 COMPLIANCE WITH STATE SAFETY REQUIREMENTS. The completed
-----------------------------------------
Facility shall include all necessary permanent safety devices, such as machinery
guards and similar ordinary safety items required by the state or federal
authorities and applicable local and national codes or requirements, or the
safety requirements of a recognized agency. Further, any features of the
Construction Work subject to such safety regulations shall be fabricated,
furnished and installed in compliance with these requirements. CONTRACTOR shall
require all subcontractors and vendors to comply with these requirements.
8.15.6 SAFETY OF TOOLS. CONTRACTOR'S equipment and tools used on
---------------
the Construction Work shall be of a capacity and a type that will safely perform
the work specified, and shall be maintained and used in a manner that will not
create a hazard to persons or property, or cause a delay in the progress of the
Construction Work.
8.15.7 CONTRACTOR'S SAFETY REQUIREMENTS IN FACILITY. From and after
--------------------------------------------
the time CONTRACTOR begins preparing and conditioning the Facility or any system
within the Facility for testing or operation pursuant to the provisions of
Article 24 hereof, CONTRACTOR and its subcontractors, while engaged in any
- ----------
activity in the Facility, shall observe and abide by all of CONTRACTOR'S safety
requirements applicable in the Facility, which shall be reviewed and reasonably
approved in advance by COMPANY.
20
Source: ADVANCED MICRO DEVIC, 10-K, March 20, 1997