eTrade 2000 Annual Report Download - page 222

Download and view the complete annual report

Please find page 222 of the 2000 eTrade annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 263

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263

A1.11 Building 4500-First Floor Demo Plan 10/30/98
A1.12 Building 4500-Second Floor Demo Plan 10/30/98
A2.11 Building 4500-First Floor Plan 10/30/98
A2.12 Building 4500-Second Floor Plan 10/30/98
A6.11 Building 4500-First Floor R.C.P. 10/30/98
A6.12 Building 4500-Second Floor R.C.P. 10/30/98
EXHIBIT 2
RESTORATION CONDITION SPECIFICATIONS
All citations to “Sheets” refer to the Preliminary Plans.
Item Modification Work Required
Restrooms
located on
first
floor of
Building
Tenant shall demolish the restrooms constructed by Tenant on the first floor and reconstruct the restrooms in the
location where the first floor restrooms are located as of the date of the Lease. The finishes within the restrooms shall be
the same as used by Tenant in constructing the first floor restrooms as shown on the Preliminary Plans, subject to
Landlord’ s review and approval of such finishes which are to be specified by Tenant s Architect in the Modification
Work Plans.
Training
room
Tenant shall convert the training room constructed on the first floor of the Building to general purpose office space,
compatible with (and with finishes similar to) other general office space within the Building. The general purpose office
space shall include, but not be limited to, electrical distribution and mechanical systems in quantities compatible with
(and similar to) other general office space within the Building as reasonably determined by Landlord.
Museum Tenant shall convert the museum constructed on the first floor of the Building, and the floor area occupied by the first
floor restroom constructed by Tenant (and to be demolished as described above), to general purpose office space,
compatible with (and with finishes similar to) other general office space within the Building. The general purpose office
space shall include, but not be limited to, electrical distribution and mechanical systems in quantities compatible with
(and similar to) other general office space within the Building as reasonably determined by Landlord.
Ceiling
systems
The reflected ceiling plan of the Preliminary Plans indicates that portions of the ceiling existing as of the date of the
Lease are to be removed and, following completion of Tenant’ s work in the Premises, there shall be no suspended
ceiling system in these areas but instead the underside of the structure of the second floor, or roof, as the case may be,
shall be exposed. In such areas, Tenant shall install a suspended ceiling system to match the adjacent ceiling system,
subject to Landlord’ s review and approval of such system to be specified in the Modification Work Plans, and which
shall be installed with a uniform and level grid, as if all of such areas were finished with the ceiling system at the time of
Tenant s construction activities. The finishes, including but not limited to mechanical systems, lighting and other
electrical distribution shall conform to other general office space within the Building as reasonably determined by
Landlord.
Gypsum board ceiling
system
The reflected ceiling plan of the Preliminary Plans indicates that portions of the ceiling existing as of the date
of the Lease are to be removed and, following completion of Tenant’ s work in the Premises, in certain areas
including the training room on the first floor, and accent areas between grid line B and D on the second floor,
gypsum board ceiling will be installed. In such areas, Tenant shall remove the gypsum board ceiling and install
a suspended ceiling system to match the adjacent ceiling system specified in the Modification Work Plans, and
which ceiling system shall be installed with a uniform and level grid, as if all of such areas were finished with
the ceiling system at the time of Tenant’ s construction activities. The finishes, including but not limited to
mechanical systems, lighting and other electrical distribution shall conform to other general office space within
the Building as reasonably determined by Landlord.
Building
infrastructure
Six (6) doors with flames in good condition, six (6) doors with frames including integral side lights in good
condition and VAV boxes that are demolished by Tenant, shall be palletized and delivered to Landlord’ s
designated storage area.
Lobby The fire rated condition of the lobby will be restored and the gypsum board finishes to the stairway (excluding
the handrail/guardrail), the finishes to the stairway landing columns, gypsum board ceiling, and wall finishes
will be restored including but not limited to mechanical systems, lighting and other electrical distribution as
reasonably determined by Landlord.
Fire Pole The fire pole that is being installed at the first and second floor of the building will be removed and the
affected areas, including but not limited to repair of the penetration in the second floor, shall be restored to
general purpose office as reasonably determined by Landlord.
2002. EDGAR Online, Inc.