eTrade 2000 Annual Report Download - page 154

Download and view the complete annual report

Please find page 154 of the 2000 eTrade annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 263

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263

the Generator.
13.2 Plans and Specifications . Tenant shall submit to Landlord for Landlord’ s review and approval plans and specifications and
working drawings (the “Generator Plans”) for the Generator, including plans for the installation of adequate screening for the
Generator. Tenant shall submit to Landlord the Generator Plans for the first Generator that Tenant plans to install in the Approved
Generator Area along with and at the same time as Tenant submits to Landlord the Preliminary Plans and Working Drawings. The time
periods and procedure set forth in Section 3.4 with respect to Tenant’ s submission of the Preliminary Plans and Working Drawings to
Landlord and Landlord’ s review and approval or disapproval of the Preliminary Plans and Working Drawings shall apply with respect
to Tenant’ s submission to Landlord and Landlord’ s review and approval or disapproval of the Generator Plans.
13.3 Parking . If the number of parking spaces in the Project are at any time reduced due to the location of the Generator or Tenant s
installation of the Generator, Tenant’ s right to use a portion of the available parking spaces in the Phase on a non-exclusive basis (as
provided in the Lease) shall be reduced by a similar number of parking spaces.
13.4 Use: Testing . Tenant may use the Generator only in the event of an interruption in the supply of electricity to the Premises or in
performing scheduled testing or maintenance of the Generator. Tenant shall conduct all testing and maintenance of the Generator
during business days after 6:00 p.m. and before 7:00 a.m. the next morning, and on weekends and holidays; provided, however, if an
existing tenant, adjacent property owner or neighbor complains to Tenant or Landlord of the noise caused by the Generator, Tenant
shall adjust Tenant’ s testing and maintenance schedule to address the complaint. In addition, Tenant may test the Generator during
business hours (with each test lasting no more than thirty (30) minutes in duration) in the event of (i) anticipated severe inclement
weather that could reasonably lead to a power outage, including, wit hout limitation, thunderstorms, high winds and excessive rain, or
(ii) emergency repairs to a Generator.
13.5 Removal . Tenant shall remove the Generator and restore the portion of the Project on which the Generator was located to its
condition existing immediately prior to Tenant’ s installation of the Generator at the expiration or earlier termination of this Lease.
13.6 No Representations or Warranties . Landlord is not making any representation or warranty to Tenant regarding Tenant’ s ability to
install the Generator in the Project in accordance with applicable governmental codes, regulations or rules. Tenant acknowledges that
(i) Tenant is responsible for ensuring that the installation of the Generator in the Project is permitted under the applicable
governmental codes, regulations or rules, and (ii) Tenant’ s ability to install the Generator in the Project is not a condition precedent to
the obligations of Tenant under this Lease.
Schedule 2
Approved Generator Area
[SITE PLAN MAP APPEARS HERE]
Schedule 1
MENLO OAKS CORPORATE CENTER
GENERAL BUILDING SPECIFICATIONS
Page 1 of 2
June 30, 1998
1. Carpet Manufactured by Designweave “New
Sabre”, 38oz. cut pile, glue down.
Throughout u.o.n.
2. Base Burke 2 inch top set base. Throughout u.o.n.
3. Doors Solid wood core door with Nevemar
plastic laminate rustic quartered oak, full
height 10’ -0” door.
As indicated on plans.
4. Frames Manufactured by Eclipse, painted
aluminum, standard building finish.
As indicated on plans.
5. Hardware Manufactured by Schlage, latchset
(L-series 03A. Style: Lever) in brass.
(Lockset not included u.o.n.)
As indicated on plans.
6. Suspended Ceiling
System
USG Donn Fineline grid system. 2’ X2”
module size. Armstrong Tegular
Cortega, Minatone 2X2 No. 704A,
White.
Throughout u.o.n.
2002. EDGAR Online, Inc.