Please find page 7 of the 2004 Freeport-McMoRan annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.ProductionfromPTFreeportIndonesia’sDeepOreZone
(DOZ)undergroundmineaveraged43,600metrictons
oforeperdayin2004.DOZoperationscontinuedfora
secondstraightyeartoperformabovedesigncapacity,
whichisbeingincreasedtoasustainablelevelof50,000
metrictonsperdaythroughahigh-returncapitalproject
toinstallasecondundergroundcrusherandadditional
ventilation.TheDOZblockcavemineisoneoftheworld’s
largestundergroundoperations.
Millthroughputincreasedthroughout2004aswe
madeprogressonourwasteremovalefforts,averaging
185,100metrictonsoforeperdayduring2004,including
afourth-quarteraverageofapproximately230,000
metrictonsoforeperday.Millthroughput,whichvaries
dependingonoretypesprocessed,isexpectedtoaverage
approximately235,000metrictonsperdayin2005.
CopperoregradesfromthePTFreeportIndonesia
operationsaveraged0.87percentforthefullyear2004,
comparedwith1.09percentfor2003.Goldoreaveraged
0.88gramspermetricton,comparedwith1.54grams
permetrictoninthepreviousyear.Gradeswerehigher
inthefourthquarter(1.17percentforcopperand1.20
gramspermetrictonforgold)andareexpectedtobe
significantlyhigherin2005than2004levels.
PTFreeportIndonesia’sunitnetcashproduction
costs,includinggoldandsilvercredits,averaged$0.40
perpoundfor2004,comparedtoanetcreditof($0.02)
in2003.Thisincreasewasprimarilytheresultoflower
salesvolumes,andtoalesserextenthigherenergy
costs,increasedmaintenancecosts,theimpactofa
strongerAustraliandollarandincreasedtreatmentand
refiningcostsresultingfromhighercopperprices.Cash
productioncostsforthefourthquarterof2004averaged
$0.17perpoundofcopper.Becauseofthefixednature
ofmostofPTFreeportIndonesia’scostsandtheeffect
ofhighersalesvolumesin2005,PTFreeportIndonesia
estimatesthatin2005unitnetcashproductioncostswill
besignificantlylowerthanin2004.Assuminganaverage
priceof$420perounceforgold,goldcreditsareexpected
toessentiallyoffsetcashproductioncostsfortheyear,
resultinginanetcashproductioncostofzerocentsper
poundofcopper.
Ouroperationsteamcontinuesitseffortstoimprove
productivityofourmining,millingandmaintenance
activities.Programsareunderway,incoordinationwith
ourpartnersandcontractors,toimproveperformance
involvingsafety,equipmentavailability,drilling
efficiency,pitroadmaintenance,logisticsandother
areasthatarepartofourcontinualimprovementand
operationsexcellenceprograms.Inaddition,work
commencedin2004onnewportalsandtunnelsystems
aspartofcommoninfrastructurewhichwillprovidefor
futuredevelopmentofundergroundoperationsandenable
ustoexpandexploratorydrillingactivities.
DOZ Block Cave Production:
Original Feasibility v. Actual/Projected
in thousands of metric tons per day
Original 1998 Feasibility Study
Actual (00-04)/Current Projections (05-09)
10
20
30
40
50
09080706050403020100
Quarterly Mill Throughput
in thousands of metric tons per day
50
100
150
200
250
4Q043Q042Q041Q04
|5