Exxon 2009 Annual Report Download - page 25

Download and view the complete annual report

Please find page 25 of the 2009 Exxon annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 53

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53

Eric฀Whetstone฀•฀Whetstone฀Design฀Lab
office:฀214-788-6336฀•฀cell:฀
EDITOR
Tracey฀Gunnlaugsson฀•฀Investor฀Relations
Exxon฀Mobil฀Corporation,฀Irving,฀TX
office:฀972-444-1151฀•฀cell:972-849-6202
fax:฀972-444-1505
tracey.c.gunnlaugsson@exxonmobil.com
Carol฀Zuber-Mallison฀•฀ZM฀Graphics
studio/cell:฀214-906-4162฀•฀fax:฀817-924-7784
carol@zmgraphics.com
Usage:฀Exclusive฀rights฀within฀ExxonMobil
(c)฀2010,฀ZM฀Graphics฀฀฀Image฀can฀not฀be฀resold
ATTENTION:OWNER
Data฀list฀is฀used฀to฀drive฀the฀black฀and฀
white฀chart,฀which฀is฀then฀used฀as฀a฀
template฀for฀the฀color฀chart.฀Bars฀and฀
lines฀are฀cut฀and฀pasted฀from฀the฀black฀
and฀white฀template฀and฀are฀highly฀
accurate.฀However,฀the฀color฀chart฀is฀
NOT฀linked฀to฀the฀database฀and฀is฀NOT฀
“driven”฀by฀the฀data;฀it฀is฀a฀piece฀of฀
artwork฀buiilt฀by฀a฀human.฀Therefore,฀the฀
editor฀needs฀to฀thoroughly฀proof฀the฀final
artwork,฀not฀JUST฀the฀data฀list.
VERSION
APPROVED฀BY
Tristan฀/฀Upstream
Feb.฀26,฀2010
FILEINFO
LAST฀FILE฀CHANGE฀MADE฀BY
39A฀09XOMF-
StartupWorld.ai
PS-2009฀StartupWorld.psd
Carol James Bill
IN฀F&O฀ON฀PAGE
IN฀SAR฀ON฀PAGE
Note:
S฀22A
Includes฀link฀file
Kizomba
Satellites
Angola
Plutao-Saturno-
Venus-Marte
Angola
Pazflor
Angola
Satellites
Phase฀1
Nigeria
Usan
Nigeria
Golden฀Pass
LNG฀Terminal
United฀States
Piceance
Phase฀1
United฀States
Kearl
Phase฀1
Canada
Fram
United Kingdom
South฀Hook
LNG฀Terminal
United Kingdom
Adriatic฀LNG
Terminal
Italy
Al฀Khaleej฀Gas
Phase฀2
Qatar
Qatargas฀2
Train฀4
Qatar
Turrum
Australia
Kipper/Tuna
Australia
Odoptu
Russia
Qatargas฀2
Train฀5
Qatar
RasGas
Train฀7
Qatar
RasGas
Train฀6
Qatar
Tyrihans
Norway
IS฀IN
SAR฀and฀F&O
Country with 2009–2012
Major Project Start-Up
Eric฀Whetstone฀•฀Whetstone฀Design฀Lab
office:฀214-788-6336฀•฀cell:฀
EDITOR
Tracey฀Gunnlaugsson฀•฀Investor฀Relations
Exxon฀Mobil฀Corporation,฀Irving,฀TX
office:฀972-444-1151฀•฀cell:972-849-6202
tracey.c.gunnlaugsson@exxonmobil.com
Carol฀Zuber-Mallison฀•฀ZM฀Graphics
studio/cell:฀214-906-4162฀•฀fax:฀817-924-7784
carol@zmgraphics.com
Usage:฀Exclusive฀rights฀within฀ExxonMobil
(c)฀2010,฀ZM฀Graphics฀฀฀Image฀can฀not฀be฀resold
ATTENTION:OWNER
Data฀list฀is฀used฀to฀drive฀the฀black฀and฀
template฀for฀the฀color฀chart.฀Bars฀and฀
lines฀are฀cut฀and฀pasted฀from฀the฀black฀
and฀white฀template฀and฀are฀highly฀
accurate.฀However,฀the฀color฀chart฀is฀
NOT฀linked฀to฀the฀database฀and฀is฀NOT฀
“driven”฀by฀the฀data;฀it฀is฀a฀piece฀of฀
artwork฀buiilt฀by฀a฀human.฀Therefore,฀the฀
editor฀needs฀to฀thoroughly฀proof฀the฀final
artwork,฀not฀JUST฀the฀data฀list.
VERSION
APPROVED฀BY
Feb.฀12,฀2010
FILEINFO
LAST฀FILE฀CHANGE฀MADE฀BY
39A฀09XOMF-
StartupWorld.ai
Carol James Bill
IN฀F&O฀ON฀PAGE
IN฀SAR฀ON฀PAGE
Note:
Includes฀link฀file
2009 Start-Up
2010–2012 Projected Start-Up
Country with 2009–2012
Eric฀Whetstone฀•฀Whetstone฀Design฀Lab
office:฀214-788-6336฀•฀cell:฀
EDITOR
Tracey฀Gunnlaugsson฀•฀Investor฀Relations
Exxon฀Mobil฀Corporation,฀Irving,฀TX
office:฀972-444-1151฀•฀cell:972-849-6202
tracey.c.gunnlaugsson@exxonmobil.com
Carol฀Zuber-Mallison฀•฀ZM฀Graphics
studio/cell:฀214-906-4162฀•฀fax:฀817-924-7784
carol@zmgraphics.com
Usage:฀Exclusive฀rights฀within฀ExxonMobil
(c)฀2010,฀ZM฀Graphics฀฀฀Image฀can฀not฀be฀resold
ATTENTION:OWNER
Data฀list฀is฀used฀to฀drive฀the฀black฀and฀
template฀for฀the฀color฀chart.฀Bars฀and฀
lines฀are฀cut฀and฀pasted฀from฀the฀black฀
and฀white฀template฀and฀are฀highly฀
accurate.฀However,฀the฀color฀chart฀is฀
NOT฀linked฀to฀the฀database฀and฀is฀NOT฀
“driven”฀by฀the฀data;฀it฀is฀a฀piece฀of฀
artwork฀buiilt฀by฀a฀human.฀Therefore,฀the฀
editor฀needs฀to฀thoroughly฀proof฀the฀final
artwork,฀not฀JUST฀the฀data฀list.
VERSION
APPROVED฀BY
Feb.฀12,฀2010
FILEINFO
LAST฀FILE฀CHANGE฀MADE฀BY
39A฀09XOMF-
StartupWorld.ai
Carol James Bill
IN฀F&O฀ON฀PAGE
IN฀SAR฀ON฀PAGE
Note:
Includes฀link฀file
Mediterranean to its operational location offshore
northeast Italy. It received its first LNG cargo from Qatar
and commenced regasification operations in 2009.
The terminal can supply up to 775 million cubic feet of
gas per day to the Italian market.
South฀HookLNG฀Terminal฀•
The South Hook LNG Terminal
(ExxonMobil interest, 24 percent) also received its first cargo
from Qatar in 2009 and began sending gas into the U.K.
grid. The terminal is located on the site of a former Esso oil
refinery in Milford Haven, Wales, and will have the capacity
to deliver up to 2 billion cubic feet of gas per day. It is being
supplied primarily from Qatargas 2 Trains 4 and 5. In 2009,
36 cargoes were unloaded at the terminal, delivering a total
of 3.5 million tonnes of LNG and providing an important new
source of supply to the U.K. market.
Al฀Khaleej฀Gas฀Phase฀2฀•฀
The second phase of the
Al Khaleej Gas Project started up in 2009. This joint venture
project has the capacity to supply 1.25 billion cubic feet
per day of gas per day to meet Qatar’s growing domestic
demand, along with 100 thousand barrels per day of liquids.
This is an expansion of Phase 1, which has operated since
2005, and brings the total supply capacity to 2 billion cubic
feet per day.
Piceance฀Phase฀1฀•฀
Located in Colorado in the United
States, the Piceance Phase 1 tight gas project (ExxonMobil
interest, 100 percent) came onstream in 2009. This phase
is expected to reach the facility capacity of 200 million
cubic feet of gas per day in 2012. Net production from
ExxonMobil’s Piceance Basin leases averaged 108 million
cubic feet of gas per day in 2009. The ultimate resource
potential is estimated at 45 trillion cubic feet.
Qatargas฀2฀Trains฀4฀and฀5฀•฀
Qatargas
2 Trains 4 and 5 (ExxonMobil interest,
30 percent and 18 percent, respectively)
started production of liquefied natural
gas (LNG) in 2009 and have a combined
design capacity of 15.6 million tonnes of
LNG per year. Deliveries from Qatargas 2
use a fleet of Q-Flex and Q-Max vessels,
the world’s largest LNG carriers. Shipments
are delivered primarily to the U.K. gas market
through the South Hook LNG regasification
terminal. Qatargas 2 is a joint development
between ExxonMobil and Qatar Petroleum.
RasGas฀Train฀6฀•฀
RasGas Train 6 (ExxonMobil
interest, 30 percent) also started up in 2009
and is owned by Ras Laffan Liquefied Natural
Gas Company (3), a joint venture between
Qatar Petroleum and ExxonMobil. The train has
a design capacity of 7.8 million tonnes of LNG per year,
and associated products include condensate, liquefied
petroleum gas (LPG), helium, and sulfur. Train 6 markets
include the United States, and deliveries to the Golden Pass
LNG regasification terminal will commence in 2010.
Adriatic฀LNG฀Terminal฀•฀
The Adriatic LNG Terminal
(ExxonMobil interest, 45 percent) is the world’s first fixed,
offshore LNG storage and regasification terminal. It was
constructed in Spain and then towed across the
RasGas Trains 6 and 7, over a kilometer in length, are each
designed to produce 7.8 million tonnes per year of LNG.
ExxonMobil฀participated฀in฀eight฀major฀start-ups฀in฀2009.฀Beyond฀2009,฀an฀additional฀54฀major฀projects฀are฀in฀
various฀stages฀of฀planning,฀design,฀and฀execution,฀from฀a฀total฀portfolio฀containing฀over฀130฀projects.
Major Development Projects
EXXON฀MOBIL฀CORPORATION฀ •฀ 2009฀SUMMARY฀ANNUAL฀REPORT
22