Exxon 2007 Annual Report Download - page 24

Download and view the complete annual report

Please find page 24 of the 2007 Exxon annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 52

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

Rosa
Angola
Kizomba C-
Mondo
Angola
Kizomba C-
Saxi/Batuque
Angola
Marimba
North
Angola
East Area NGL II
Nigeria
Thunder Horse
United States
Volve
Norway
Starling
United Kingdom
South Hook
LNG Terminal
United Kingdom
Adriatic LNG
Terminal
Italy
Statfjord
Late Life
Norway
Ormen
Lange
Norway
Waddenzee
Netherlands
Tengiz Phase 1
Kazakhstan
ACG Phase 3
Azerbaijan
RasGas
Train 6
Qatar
RasGas
Train 5
Qatar
Jerneh B
Malaysia
Qatargas II
Train 4
Qatar
Major Development Projects
ExxonMobil participated in seven
major project start-ups in 2007,
with 12 more anticipated in 2008.
Beyond 2008, an additional
47 major projects are in various
stages of project planning and execution.
2 0 0 7 PR O J ECT STA RT- U PS
RasGas Train 5 •
The Ras Laffan Liquefied Natural Gas
Company II Train 5 in Qatar was completed under budget
and ahead of schedule. The onshore facilities came online
in November 2006 and the offshore facilities in January 2007.
With production of 4.7 million tons per year of LNG, it is the
third train built of this size at RasGas with the “Design One,
Build Multiple” strategy, enabling this project to outperform
the original cost and schedule estimates.
Marimba North
The Marimba North project began
production in September 2007 and will develop 80 million
barrels of oil (gross) in approximately 3900 feet of water,
90 miles off the coast of Angola. The project is a subsea
tie-back to the Kizomba A development and was completed
ahead of schedule and within budget.
Ormen Lange •
The Ormen Lange project offshore Norway
started production in September 2007. The project will
develop almost 13 trillion cubic feet of gas and 175 million
barrels of natural gas liquids (gross).
2007 Start-Up
2008 Projected Start-Up
Country with 2007/2008
Major Project Start-Up
Tengiz Phase 1 •
Initial oil production from the first expansion
of the Tengiz development in Kazakhstan was achieved in
October 2007. This expansion, when complete, will integrate
a second-generation gas-handling project with sour-gas
injection, resulting in incremental production of 285 thousand
barrels of oil per day (gross).
Rosa
Production from the Rosa field in Angola began in
June 2007. This 360-million-barrel (gross) development is
located approximately 85 miles offshore in a water depth
of 4500 feet. The field is tied back to the existing Girassol
floating production, storage, and offloading (FPSO) vessel.
Statfjord Late Life •
The Statfjord Late Life project offshore
Norway started up in October 2007. This project will develop
1.1 trillion cubic feet of gas and 186 million barrels of oil and
natural gas liquids (gross).
Waddenzee •
Start-up of the Moddergat and Nes fields in the
Waddenzee area in the Netherlands was achieved on time
and on budget in 2007.
(Above) Gas from the Ormen Lange field is processed at a new plant at Nyhamna before being transported 750 miles to the U.K. (Below) Production
of LNG from Ras Laffan Liquefied Natural Gas Company II Train 5 began just 29 months after major construction contracts were awarded.