Energy Transfer 2010 Annual Report Download - page 11

Download and view the complete annual report

Please find page 11 of the 2010 Energy Transfer annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 187

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187

Midstream
The following details our assets in the midstream segment.
Southeast Texas System
5,200 miles of natural gas pipeline
1 natural gas processing plant (the La Grange plant) with aggregate capacity of 240 MMcf/d
12 natural gas treating facilities with aggregate capacity of 1.5 Bcf/d
4 natural gas conditioning facilities with aggregate capacity of 670 MMcf/d
The Southeast Texas System is an integrated system located in Southeast Texas that gathers, compresses, treats,
processes and transports natural gas from the Austin Chalk trend. Upon completion of the Chisholm pipeline, the
La Grange processing plant will also process rich gas from the Eagle Ford Shale. The Southeast Texas System is
a large natural gas gathering system covering thirteen counties between Austin and Houston. This system is
connected to the Katy Hub through the East Texas pipeline and is connected to the Oasis pipeline, as well as two
power plants. This allows us to bypass our processing plants and treating facilities when processing margins are
unfavorable by blending untreated natural gas from the Southeast Texas System with natural gas on the Oasis
pipeline while continuing to meet pipeline quality specifications.
The La Grange processing plant is a cryogenic natural gas processing plant that processes the rich natural gas that
flows through our system to produce residue gas and NGLs.
Our treating facilities remove carbon dioxide and hydrogen sulfide from natural gas gathered into our system
before the natural gas is introduced to transportation pipelines to ensure that the gas meets pipeline quality
specifications. In addition, our conditioning facilities remove heavy hydrocarbons from the gas gathered into our
systems so the gas can be redelivered and meet downstream pipeline hydrocarbon dew point specifications.
North Texas System
160 miles of natural gas pipeline
1 natural gas processing plant (the Godley plant) with aggregate capacity of 480 MMcf/d
1 natural gas conditioning facility with capacity of 100 MMcf/d
The North Texas System is an integrated system located in four counties in North Texas that gathers, compresses,
treats, processes and transports natural gas from the Barnett Shale trend. The system includes our Godley
processing plant, which processes rich natural gas produced from the Barnett Shale and is integrated with the
North Texas System and the ET Fuel System. The facility consists of a cryogenic processing plant and a
conditioning facility.
Canyon Gathering System
1,390 miles of natural gas pipeline
5 natural gas conditioning facilities with aggregate capacity of 96 MMcf/d
The Canyon Gathering System consists of gathering pipeline ranging in diameters from two inches to 24 inches
in the Piceance and Uinta Basins of Colorado and Utah and conditioning plants.
Northern Louisiana
238 miles of natural gas pipeline
5 natural gas treating facilities with aggregate capacity of 435 MMcf/d
9