Atmos Energy 2014 Annual Report Download - page 34

Download and view the complete annual report

Please find page 34 of the 2014 Atmos Energy annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 36

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36

32
Forward-looking Statements
e matters discussed or incorporated by reference in this Summary Annual Report may contain “forward-looking
statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities
Exchange Act of 1934. All statements other than statements of historical fact included in this report are for-
ward-looking statements made in good faith by the Company and are intended to qualify for the safe harbor from
liability established by the Private Securities Litigation Reform Act of 1995. When used in this report or any other
of the Company’s documents or oral presentations, the words “anticipate,” “believe,” “estimate,” “expect,” “forecast,
goal,” “intend,” “objective,” “plan,” “projection,” “seek,” “strategy” or similar words are intended to identify for-
ward-looking statements. Such forward-looking statements are subject to risks and uncertainties that could cause
actual results to dier materially from those discussed in this report. ese risks and uncertainties are discussed in
the Companys Annual Report on Form 10-K for the scal year ended September 30, 2014. Although the Company
believes these forward-looking statements to be reasonable, there can be no assurance that they will approximate
actual experience or that the expectations derived from them will be realized. Further, the Company undertakes
no obligation to update or revise any of its forward-looking statements, whether as a result of new information,
future events or otherwise.
Other Information
You can view this Summary Annual Report, our Annual Report on Form 10-K and other nancial documents for
scal 2014 and previous years at www.atmosenergy.com.
If you are a shareholder who would like to receive our Summary Annual Report and other company documents
electronically in the future, please sign up for electronic distribution. Its convenient and easy, and it saves the costs
to produce and distribute these materials.
To receive these documents by electronic delivery next year, please visit www.atmosenergy.com or www.proxyvote.
com to give your consent. Please remember that accessing our Summary Annual Report and other company docu-
ments over the Internet may result in charges to you from your Internet service provider or telephone company.
© 2014 Atmos Energy Corporation. All rights reserved.
Atmos Energy® is a registered trademark of Atmos Energy Corporation.
Cover: Texas State Highway Loop 12, the inner beltway surrounding Dallas, is among the busiest transportation
corridors in the Dallas-Fort Worth Metroplex. Beneath the highway lies another major transportation artery, Atmos
Energy’s Line DT-3. This 24-inch pipeline transports natural gas for thousands of homes and businesses in the Dal-
las central business district, the I-35 corridor, Irving, Las Colinas, Arlington, Grand Prairie and the Mid-Cities. It also
provides essential pressure control for the region and lets us dispatch gas supplies either north or south, depending
on our customers’ demands. All DT-3 pipe and related facilities in Irving and Las Colinas are being replaced by
fiscal 2016 to ensure long-term safety and reliability. It is one of Atmos Energy’s major multi-year pipeline projects.
Page 16: Phil Watkins (left), project manager and senior engineer, and Roy Moss, a district operations manager,
survey an inventory of 30-inch coated steel pipe that will be installed during fiscal 2015. Along with related 24-inch
and 12-inch transmission projects, the new pipelines will fortify Atmos Pipeline–Texas’ capabilities to transport
natural gas from two of its natural gas storage fields to meet the growing needs of the Mid-Tex Division and other
Atmos Pipeline–Texas customers. The total project will cost an estimated $200 million to $230 million.
Opposite: Near the beautiful Sabine National Forest in western Louisiana, 2.5 miles of 6-inch advanced polyeth-
ylene pipeline is being installed to replace a bare steel main that serves the city of Many. The project is one of many
under way today in our Louisiana Division to replace aging pipelines. It is the result of the Louisiana Public Service
Commission authorizing in June 2014 an infrastructure deferral mechanism for safety and reliability projects.