AMD 2003 Annual Report Download - page 223

Download and view the complete annual report

Please find page 223 of the 2003 AMD annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 293

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
  • 201
  • 202
  • 203
  • 204
  • 205
  • 206
  • 207
  • 208
  • 209
  • 210
  • 211
  • 212
  • 213
  • 214
  • 215
  • 216
  • 217
  • 218
  • 219
  • 220
  • 221
  • 222
  • 223
  • 224
  • 225
  • 226
  • 227
  • 228
  • 229
  • 230
  • 231
  • 232
  • 233
  • 234
  • 235
  • 236
  • 237
  • 238
  • 239
  • 240
  • 241
  • 242
  • 243
  • 244
  • 245
  • 246
  • 247
  • 248
  • 249
  • 250
  • 251
  • 252
  • 253
  • 254
  • 255
  • 256
  • 257
  • 258
  • 259
  • 260
  • 261
  • 262
  • 263
  • 264
  • 265
  • 266
  • 267
  • 268
  • 269
  • 270
  • 271
  • 272
  • 273
  • 274
  • 275
  • 276
  • 277
  • 278
  • 279
  • 280
  • 281
  • 282
  • 283
  • 284
  • 285
  • 286
  • 287
  • 288
  • 289
  • 290
  • 291
  • 292
  • 293

If and to the extent the description of Fab X is insufficient in order to define specifications for Fab X reference shall be made to the specifications and
descriptions under the agreement of November 28,/December 5, 2002 relating to the Advanced Technology and Process Center (ATPC) or, if this
agreement is insufficient to the specifications and descriptions under the Design/Build Agreement of November 15, 1996.
The parties acknowledge and confirm that in case more than one way of executing the Works leads to completion of Fab X or a component or part thereof
meeting the standards and requirements provided in this Agreement, Company has the right to choose the way of execution. If exercising such right to
choose leads to cost or time impact this impact is covered by the change procedure provided for in no. 4.
These aforementioned obligations include, but are not limited to, all and any Works described and provided for in the design documents attached as
Exhibit 3 Design. All standards or requirements necessary or expedient as described herein for completing Fab X in a turn-key and functional manner and
in a ready for unrestricted hook up condition shall be met by the Works, this includes, but is not limited to, meeting all standards and requirements
provided for in the design documents attached as Exhibit 3 Design.
As exception, the Parties clarify that to the extent regulations in Exhibit 3 Design deal with the technical solution for insurance reasons (FM or VDS)
(which is still pending) elements of the Works are only covered by the lump sum provided for in no. 3.1 to the extent these aforementioned elements of
the Works are explicitly described in Exhibit 3 Design. To the extent that regarding the aforementioned elements of the Works works or services other
than those contained in Exhibit 3 Design are requested the impact on the remuneration shall be determined in accordance with the procedure provided for
under no. 4.
The Contractor shall with regard to planning, designing, constructing, erecting, installing, equipping, starting up, calibrating, adjusting and turning over
use best efforts to secure maximum possible value added and to execute the Works in a manner that there is no detrimental impact on the operation of, and
production in, Fab 30.
Moreover, Contractor is aware of the impact executing the Works under this Agreement could have on the operation of, and the production in, the
adjacent Fab 30. Contractor acknowledges that Contractor is aware that any
10
Source: ADVANCED MICRO DEVIC, 10-K, March 09, 2004