Fluor 2006 Annual Report Download - page 18

Download and view the complete annual report

Please find page 18 of the 2006 Fluor annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 28

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

16 Power
4�
REVENUE BY SEGMENT
POWER
     
2004
2005
200�
POWER
(DOLLARS IN BILLIONS)
(background) Fluor is providing full EPC on this 200MW plant for Newmont Mining in Nevada.
We know that new power capacity has to be built, with fuels ranging from coal, oil and natural
gas to nuclear. Fluor can play in all of these fields.
David Constable, Group President, Power