Cathay Pacific 2013 Annual Report Download - page 13

Download and view the complete annual report

Please find page 13 of the 2013 Cathay Pacific annual report below. You can navigate through the pages in the report by either clicking on the pages listed below, or by using the keyword search tool below to find specific information within the annual report.

Page out of 52

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

Cathay Pacific Airways Limited Interim Report 2013 11
2013 Interim Review
FLEET PROFILE*
Aircraft type
Number as at 30th June 2013
Total
Firm orders
Total
Expiry of operating leases
OptionsOwned
Leased
Finance Operating ‘13 ‘14
‘15 and
beyond ‘13 ‘14 ‘15 ‘16 ‘17
‘18 and
beyond
Aircraft operated by Cathay Pacific:
A330-300 14 15 8(a) 37 3 5 3 11 2 1 3 2
A340-300 6 5 11
A350-900 22(b) 22
A350-1000 26 26
747-400 13 1 14 1
747-400F 3(c) 36
747-400BCF 1(d) 1(e) 21
747-400ERF 6 6
747-8F 9 944(d)
777-200 5 5
777-200F 5(d)
777-300 7 5 12
777-300ER 5 11 16 32 6 8 4 18 2 14
Total 54 54 26 134 13 13 55 81 3 1 5 17 5
Aircraft operated by Dragonair:
A320-200 5 10(f) 15 2 2 6
A321-200 2 4(f) 62(g) 22 2
A330-300 4 1 13(h) 18 35122
Total 11 1 27 39 223 5 5 6 2 6
Aircraft operated by Air Hong Kong:
A300-600F 2 6 8
747-400BCF 3 31 2
Total 2 6 3 11 1 2
Grand total 67 61 56 184 13 15 55 83 3 5 8 8 9 23 5
* Includes parked aircraft. The table does not reflect aircraft movements after 30th June 2013.
(a) One aircraft was transferred to Dragonair in July 2013.
(b) Including two aircraft on 12-year operating leases.
(c) One aircraft was parked in May 2013.
(d) Four Boeing 747-400BCF aircraft were agreed to be sold to The Boeing Company in March 2013.Three of these aircraft were delivered in the first half of
2013. One will be delivered in August 2013.An order for eight Boeing 777-200F aircraft was cancelled in March 2013. At the same time, three new
Boeing 747-8F aircraft were agreed to be purchased (for delivery in the second half of 2013) and options to purchase five Boeing 777-200F aircraft
wereacquired.
(e) Aircraft was parked in August 2013.
(f) The operating leases of three Airbus A320-200 and three Airbus A321-200 aircraft were extended in July 2013. The leases of these aircraft will expire
after 2018.
(g) In February, the Group agreed to lease two new Airbus A321-200 aircraft. These aircraft will be delivered in February and October 2014.
(h) One aircraft was returned to the lessor in July 2013.